Search

Top Links
VisionHRM

Fall River Village Core Models

 

 

  • The links below contain design models of the Fall River Village Core that were prepared to help the Fall River Community imagine what they want the Fall River Village Centre to look like in the future.
  • These models do not represent an actual development proposal.
  • They were prepared only as a tool to assist the Fall River Community Planning Group (CPG) prepare design guidelines/regulations for future development of the Fall River Centre.
  • Please view the models and send an email to fallrivervic@gmail.com to let the CPG know what you would like to see in the Fall River Village Core in the future.

 

June 15, 2009 - Preferred Growth Model

Final Model

 

 

Selected Models for Discussion at Upcoming Open Houses
Model 2 Model 4 Model 5

Note:  The above models were selected by the CPG as preferred models and include revisions from feedback received during the April 8th CPG design workshop.  The revised models will be presented to the CPG on the upcoming April 20th CPG design workshop for comments.

 

April 8, 2009 - Models Reviewed by CPG
Model 1 Model 2 Model 3 Model 4 Model 5

Note:  The above models contain feedback from the April 8th CPG design workshop.

 

March 9, 2009 - Models Reviewed by CPG

Model 2

Model 3