Traffic Delay - Larry Uteck Boulevard

Posted:

EN
FR

Le texte en français suit

Location: Larry Uteck Boulevard between Brookline Drive and Ella Lane

Date: Wednesday, Aug. 3 to Wednesday, Aug. 24

Time: 9 a.m. to 4 p.m. on weekdays only

Work details: Traffic delays will be in place to facilitate the installation of a Heritage Gas pipeline. For questions, residents may contact Heritage Gas at 902.466.2003.

Traffic impact: A lane reduction will be in place, and a portion of the sidewalk on the west side of Larry Uteck Boulevard will be closed, during working hours. Motorists should expect delays and are asked to use alternative routes whenever possible. 

**************************************************************************************************

Emplacement : Boulevard Larry Uteck entre la promenade Brookline et l’allée Ella

Date : Du mercredi 3 août au mercredi 24 août

Heure : De 9 h à 16 h, en semaine seulement

Détails des travaux : Ralentissement de la circulation sera en place pour faciliter l’installation d’un gazoduc d’Heritage Gas. Pour toute question, les résidents peuvent communiquer avec Heritage Gas au 902.466.2003.

Impact sur la circulation : Une réduction de voie sera en place, et une partie du trottoir du côté ouest du boulevard Larry Uteck sera fermée, pendant les heures de travail. Les automobilistes doivent s’attendre à des ralentissements et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.