Road Construction – Prince Albert Road

Posted:

EN
FR

Le texte en français suit

UPDATE: This work will continue on Thursday, May 18 from 7-8 p.m.

Location: Prince Albert Road, between Bolton Terrace and Sinclair Street  

Date: Wednesday, May 17 Thursday, May 18

Time: 2-4 p.m.7-8 p.m.

Work details: This work includes asphalt repair, in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Lane drops with occasional stop-and-go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible.

**************************************************************************************************

 

MISE À JOUR : Ce travail se poursuivra le jeudi 18 mai de 19h à 20h.

Construction routière – Chemin Prince Albert

Lieu : Chemin Prince Albert, entre Bolton Terrace et la rue Sinclair   

Date : Le mercredi 17 mai jeudi 18 mai

Heure : De 14 h à 16 h de 19h à 20h

Détails des travaux : Ces travaux comprennent la réparation de l’asphalte, à l’appui du Plan des priorités stratégiques du Conseil régional 2021-2025 visant à établir un réseau de mobilité intégré, sécuritaire et accessible.

Répercussions sur la circulation : Des réductions de voie avec une circulation occasionnellement intermittente seront en place pendant que les travaux sont en cours. Les automobilistes doivent s’attendre à des ralentissements et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.