Traffic Delay - Bedford Highway

Posted:

EN
FR

​​​​​​Le texte en français suit.

Location: Bedford Highway from Civic 30 to Flamingo Drive

Date: Sunday, May 4 to Friday, May 9

Time: 7 p.m. to 6 a.m.

Work details: This is to facilitate road repairs in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Lane drops will be in place during this work. Drivers should expect delays and are asked to use alternative routes where possible. 

*************************************************************************************************************************************
Ralentissement de la circulation – Route Bedford

Lieu : Route Bedford, de l’adresse civique 30 à la promenade Flamingo

Date : Du dimanche 4 mai au vendredi 9 mai

Heure : De 19 h à 6 h.

Détails des travaux : Ces travaux visent à faciliter les réparations de l’asphalte, lesquels appuient le Plan des priorités stratégiques du Conseil régional de 2021-2025 visant à établir un réseau de mobilité intégré, sécuritaire et accessible.

Répercussions sur la circulation : Des fermetures de voie seront en place pendant ces travaux. Les conducteurs doivent s’attendre à des ralentissements et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.