Traffic Delay – Bedford Highway

Posted:

EN
FR

​​​​​​Le texte en français suit.

Location: Bedford Highway, from Shaunslieve Drive to Charlotte Lane

Date: Sunday, May 4 to Friday, May 23 (weekdays only, with the exception of Saturday, May 10)

Time: Sunday, May 4 to Friday, May 23 from 7 p.m. to 6 a.m. daily

Saturday, May 10 from 7 p.m. to Sunday, May 11 at 6 a.m.

Work details: This work is needed for road repairs in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network.

Traffic impact: Stop-and-go traffic will be in place while work is underway. Motorists should expect delays and are asked to use alternative routes where possible.

***************************************************************************************************************************************

Ralentissement de la circulation – Autoroute Bedford

Lieu: Autoroute Bedford, de la promenade Flamingo à la rue Charlotte

Date: Du dimanche 4 mai au vendredi 23 mai (en semaine seulement, à l’exception du samedi 10 mai)

Heure: Du dimanche 4 mai au vendredi 23 mai de 19 h à 6 h chaque jour.

Le samedi 10 mai de 19 h au dimanche 11 mai à 6 h.

Détails des travaux: Ces travaux sont nécessaires pour les réparations de l’asphalte, lesquels appuient le Plan des priorités stratégiques du Conseil régional de 2021-2025 visant à établir un réseau de mobilité intégré, sécuritaire et accessible.

Impact sur la circulation: La circulation sera intermittente pendant la durée des travaux. Les automobilistes doivent s’attendre à des ralentissements et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.