2023/2024 Bus Stop Construction
A list of current plans for bus stop construction, adjustments and improvements by district. To look up your district, enter your street address into our District Look-up tool. If you have any questions, or to report any issues (i.e., drainage or sewer lateral issues) please contact 311.
Please note: If your district is not listed, there is no construction planned for 2023/2024.
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
Brooks Dr At East Preston Rec Centre (8929) | 24 Brooks Dr | West side of Brooks Dr abutting Civic 24 | Slight relocation - New connection to multi-use path. | Pending 2024 construction |
Brooks Dr Opposite East Preston Rec Centre (8769) | 11 Brooks Dr | East side of Brooks Dr abutting Civic 11 | Slight relocation - New pad. | Pending 2024 construction |
Cain St After Churchill Terr (6331) | 15 Cain St and 2 Churchill Terr | Northeast side of Cain St from Civic 15 to intersection of Churchill Terr | New concrete pad, new sidewalk. | June 2023 construction |
Clarence St After Cain St (8506) | 34 Clarence St | Northwest side of Clarence St from Civic 34 to the intersection of Cain St | New concrete pad, new sidewalk. | June 2023 construction |
Hwy 7 After Civic 1776 (8767) | 1776 Hwy 7 | East side of Hwy 7 abutting Civic 1776 | Slight relocation - New pad. | Pending 2024 construction |
Hwy 7 After Upper Governor St (8930) | 1977 Hwy 7 | Northwest side of Hwy 7 abutting Civic 1977 | New pad, new connection to multi-use path. | Pending 2024 construction |
Hwy 7 At Civic 1799 (8931) | 1799 Hwy 7 | West side of Hwy 7 abutting Civic 1799 | Slight relocation - New connection to multi-use path. | Pending 2024 construction |
Hwy 7 Before Circle Dr (8918) | 3293 Hwy 7 | North side of Hwy 7 abutting Civic 3293 | Widen gravel shoulder, new asphalt pad. | Pending 2023 construction |
Hwy 7 Before Lower Governor St (8768) | 1 Lower Governor St | Southeast side of Hwy 7 adjacent 1 Lower Governor St | Slight relocation - New pad. | Pending 2024 construction |
Hwy 7 Before Martin Lake Dr (8920) | 3103 Hwy 7 | West side of Hwy 7 abutting Civic 3103 | Widen gravel shoulder, new asphalt pad. | Pending 2023 construction |
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address(es) | Location of Work | Scope of Work | Status |
Collins Grv At Civic 83 (2268) | 83 Collins Grv | West side of Collins Grv abutting Civic 83 | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Collins Grv Before Collins Grove Rg (2269) | 1 Collins Grove Rg | South side of Collins Grv adjacent 1 Collins Grove Rg | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Lucien Dr After Dorothea Dr (2260) | 85 Lucien Dr | Northeast side of Lucien Dr abutting 85 Lucien Dr | Relocating bus stop away from intersection. Installing new concrete between curb and sidewalk. | Completed October 2023 |
Lucien before Whynette (2261) | 58 Lucien Dr | Northeast side of Lucien abutting 58 Lucien Dr | New concrete pad between curb and sidewalk. | Completed October 2023 |
Main Rd Before Bonaventure St (7486) | No abutting Civic address | Northwest side of Main Rd near Bonaventure St | Shelter replacement. | Pending 2023 construction |
Portland Hills Terminal Bay 1 (8949) | No abutting Civic address | Portland Hills Terminal | Shelter replacement. | Completed November 2023 |
Portland Hills Terminal Bay 4 (8952) | No abutting Civic address | Portland Hills Terminal | Shelter replacement. | Completed November 2023 |
Portland Hills Terminal Bay 5 (8953) | No abutting Civic address | Portland Hills Terminal | Shelter replacement. | Completed November 2023 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Ashgrove Ave After Cole Harbour Rd (6048) | 1150 Cole Harbour Rd | West side of Ashgrove Ave abutting 1150 Cole Harbour Rd | Shelter replacement. | Completed October 2023 |
Astral Dr After Willowdale Dr (6056) | 31 Astral Dr | South side of Astral Dr abutting Civic 31 | New sidewalk. | Completed October 2023 |
Astral Dr Before Spence Dr (6059) | 1 Spence Dr | South side of Astral Dr adjacent 1 Spence Dr | New sidewalk. | Completed October 2023 |
Circassion Dr After Ellerslie Cr (2307) | 62 Circassion Cr | East side of Circassion Dr abutting Civic 62 | Relocation of bus stop Circassion Dr Before Ellerslie (6425) after Ellerslie Cr. New concrete pad between curb and sidewalk. | Pending 2024 construction |
Cole Harbour Rd After Armbro Ln (6475) | 1108 Cole Harbour Rd | South side of Cole Harbour Rd abutting Civic 1108 | Shelter replacement. | November 2023 construction |
Cole Harbour Rd After Otago Dr (6478) | 915 Cole Harbour Rd | North side of Cole Harbour Rd abutting Civic 915 | Shelter replacement. | Completed October 2023 |
Cole Harbour Rd Before Dorothea Dr (6481) | 907 Cole Harbour Rd | North side of Cole Harbour Rd opposite Civic 912 | Shelter replacement. | Pending 2023 construction |
Forest Hills Pky At Cole Harbour Place (6669) | 51 Forest Hills Pky | East side of Forest Hills Pky abutting Civic 51 | New shelter. | Pending 2023 construction |
Karen Dr After Hillsboro Dr (7012) | 19 Karen Dr | North side Karen Dr abutting Civic 19 | Discontinued stop - Remove concrete and post, reinstate sod. | Completed August 2023 |
Otago Dr After Poplar Dr (7399) | 475 Poplar Dr | West side of Otago Dr adjacent 475 Poplar Dr | New concrete pad and sidewalk. | Completed September 2023 |
Otago Dr Before Poplar Dr (7398) | 29 Otago Dr | East side of Otago Dr abutting Civic 29 | New concrete pad. | Completed September 2023 |
Pearl Dr Before Amethyst Cr (6061) | 1 Amethyst Cres | West side of Pearl Dr across from Civic 9 | Discontinued stop - Remove concrete, reinstate sod. | Completed September 2023 |
Sherwood St Opposite Woodbury Dr (8268) | 70 Woodbury Dr | South side of Sherwood St at Woodbury Dr and Sherwood St intersection | Discontinued stop - Remove concrete, reinstate sod. | Completed September 2023 |
Taranaki Dr After Greely Ct (8376) | 238 Taranaki Dr | East side of Taranaki Dr abutting Civic 238 | Discontinued stop - Remove concrete and post, reinstate sod. | Completed August 2023 |
Taranaki Dr After Karen Dr (8375) | 171 Taranaki Dr | North side of Taranaki Dr abutting Civic 171 | Discontinued stop - Remove concrete and post, reinstate sod. | Completed August 2023 |
Taranaki Dr At Civic 194 (8379) | 194 Taranaki Dr | East side of Taranaki Dr abutting Civic 194 | Discontinued stop - Remove concrete and post, reinstate sod. | Completed August 2023 |
Taranaki Dr Before Forest Hills Pky (8378) | 289 Taranaki Dr | North side of Taranaki Dr abutting Civic 289 | Discontinued stop - Remove concrete and post, reinstate sod. | Completed August 2023 |
Taranaki Dr Before Greely Ct (8377) | 251 Taranaki Dr | East side of Taranaki Dr abutting Civic 251 | Discontinued stop - Remove concrete, reinstate sod. | Completed August 2023 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Crichton Ave Before Dahlia St (6535) | No abutting address | East side of Crichton Ave adjacent Sullivan's Pond Park | Shelter replacement. | Completed November 2023 |
Micmac Terminal Bay 1 (8171) | 21 Micmac Blvd | East side of Micmac Blvd abutting Civic 21 | Shelter replacement. | Completed November 2023 |
Micmac Terminal Bay 2 (8172) | 21 Micmac Blvd | East side of Micmac Blvd abutting Civic 21 | Shelter replacement. | Completed November 2023 |
Pleasant St Before Prince Arthur Ave (9007) | 205 Pleasant St | East sde of Pleasant St abutting Civic 205 | Shelter replacement. | Pending 2023 construction |
Pleasant St Before Southdale St (7485) | 181 Pleasant St | East side of Pleasant St abutting Civic 181 | Shelter replacement. | Pending 2023 construction |
Portland St After Gaston Rd (8038) | 2 Nicole Ct | East side of Portland St adjacent 2 Nicole Ct | Shelter replacement. | Pending 2023 construction |
Sea King Dr After Ernest Ave (8264) | 2 Sea King Dr | South side of Sea King Dr abutting 2 Sea King Dr | Relocation of stop towards Earnest Ave and installation of landing pad and sidewalk. | Pending 2024 construction |
Sea King Dr Before Lancaster Dr (8265) | 34 Sea King Dr | West Side of Lancaster Dr abutting 42 Sea King Dr | Relocation of stop to Lancaster Dr and installation of concrete pad between curb and sidewalk. | Pending 2024 construction |
Sea King Dr After Lancaster Dr (8263) | 35 Sea King Dr | North Side of Sea King Dr adjacent to 35 Sea King Dr | Installation of concrete pad between curb and sidewalk. | Pending 2024 construction |
Sea King Dr Before Ernest Ave (8266) | 1 Sea King Dr | Norh side of Sea King Dr abutting 1 Sea King Drive | Installation of concrete pad between curb and sidewalk. | Pending 2024 construction |
Victoria Rd After Boland Rd (8419) | 169 Victoria Rd | South side of Victoria Rd abutting Civic 169 | Shelter replacement. | Pending 2023 construction |
Windmill Rd Before Wyse Rd (7196) | 53 Windmill Rd | South side of Windmill Rd abutting Civic 55 | Relocation of bus stop outside of driveway. Concrete pad between curb and sidewalk. | Completed August 2023 |
Windmill Rd Opposite Pelzant St (8542) | No abutting address | West side of Windmill Rd adjacent DND | Shelter replacement. | Pending 2023 construction |
Windmill Rd Opposite Wallace St (8546) | 269 Windmill Rd | West side of Windill Rd abutting Civic 269 | Shelter replacement. | Pending 2023 construction |
Woodland Ave After Slayter St (2306) | 18 Woodland Ave | East side of Woodland Ave abutting Civic 18 | Relocation of bus stop Woodland Ave Before Slayter St (8587). Concrete pad between curb and sidewalk. | Pending 2024 construction |
Woodland Ave Before Slayter St (2305) | 19 Woodland Ave | West side of Woodland Ave abutting Civic 19 | Relocation of bus stop Woodland Ave After Slayter St (8585). Concrete pad between curb and sidewalk. | Pending 2024 construction |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Braemar Dr Before Creelman Dr (6312) | 177 Braemar Dr | West side of Braemar Dr adjacent Lake Micmac | New concrete shelter pad. | Pending 2024 construction |
Cutler Ave After Civic 645 (2280) | Civic 245 | East side of Cutler Ave abutting Civic 245 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Cutler Ave After Higney Ave (2282) | Civic 305 | East side of Cutler Ave abutting Civic 305 | New concrete pad and sidewalk. | Completed October 2023 |
Cutler Ave After Higney Ave (2294) | 306 Higney Ave | West side of Cutler Ave adjacent 306 Higney Ave | New concrete pad between curb and sidewalk. | Completed October 2023 |
Cutler Ave After Jim Connors Ave (2281) | Civic 433 | East side of Cutler Ave before Civic 433 | New concrete pad and sidewalk. | Completed October 2023 |
Cutler Ave At Civic 89 (2283) | Civic 89 | West side of Cutler Ave abutting Civic 89 | New concrete pad and sidewalk. | Completed October 2023 |
Cutler Ave At Civic 90 (2293) | Civic 90 | East side of Cutler Ave abutting Civic 90 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Cutler Ave Before Civic 680 (2296) | Civic 680 | West side of Cutler Ave before Civic 680 | New concrete pad between curb and sidewalk. New concrete shelter pad and shelter. | Completed October 2023 |
Cutler Ave Before Jim Connors (2295) | Civic 464 | West side of Cutler Ave abutting Civic 464 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Hudson Way At Civic 10 (2297) | Civic 10 | East side of Hudson Way abutting Civic 10 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Hudson Way Before Princess Margaret Blvd (2298) | Civic 320 | East side of Hudson Way abutting Civic 320 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Ilsley Ave At Civic 121 (6958) | 121 Ilsley Ave | East side of Ilsley Ave abutting Civic 121 | New concrete pad and sidewalk. | Pending 2024 construction |
Ilsley Ave Before MacDonald Ave (6959) | 133 Ilsley Ave | East side of Ilsley Ave abutting Civic 133 | New concrete pad and sidewalk. | Pending 2024 construction |
Ilsley Ave Opposite Halifax Transit (6949) | 133 Ilsley Ave | East side of Ilsley Ave abutting Civic 133 | New concrete pad and sidewalk. | Pending 2024 construction |
Jennett Ave After Guildford Ave (2289) | 165 Jennett Ave | South side of Jennett Ave before Civic 165 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Jennett Ave After John Savage Ave (2288) | 133 John Savage Ave | South side of Jennett Ave adjacent 133 John Savage Ave | New concrete pad between curb and sidewalk. | Completed October 2023 |
Jennett Ave Before Wilkinson Ave (2290) | 240 Jennett Ave | South side of Jennett Ave after Civic 2290 | New concrete pad between curb and sidewalk. | Completed October 2023 |
John Savage Ave After Wright Ave (2287) | 183 John Savage Ave | East side of John Savage Ave abutting Civic 183 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Leaman Dr Before Ambercrest Pl (2251) | 24 Leaman Dr | East side of Leaman Drive between Civic 24 and Ambercrest Pl. | New concrete sidewalk | Pending 2024 construction |
Marketplace Dr After Bancroft Ln (2034) | 100 Marketplace Dr | East side of Marketplace Dr opposite Civic 100 | Slight relocation - new concrete pad between curb and sidewalk. Remove old concrete and reinstate sod. | Completed August 2023 |
Princess Margaret Blvd After Windmill Rd (8075) | 463 Windmill Rd | North side of Princess Margaret Blvd abutting 463 Windmill Rd | New concrete pad and sidewalk. | Pending 2024 construction |
Princess Margaret Blvd Before Windmill Rd (8078) | 461 Windmill Rd | South side of Princess Margaret Blvd abutting 461 Windmill Rd | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Ronald Smith Ave After Ilsley Ave (8241) | 121 Ilsley Ave | South side of Ronald Smith Ave adjacent 121 Ilsley Ave | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Wilkinson Ave After Cutler Ave (2284) | 670 Wilkinson Ave | West side of Wilkinson Ave abutting Civic 670 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Wilkinson Ave After Jennett Ave (2286) | 18 Higney Ave | West side of Wilkinson Ave opposite 18 Higney Ave | New concrete pad between curb and sidewalk. | Completed October 2023 |
Wilkinson Ave At Civic 795 (2291) | 795 Wilkinson Ave | East side of Wilkinson Ave abutting Civic 795 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Wilkinson Ave Before Cutler Ave (2292) | 635 and 673 Wilkinson Ave | East side of Wilkinson Ave abutting Civics 635 and 673 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Wilkinson Ave Opposite Civic 763 (2285) | 763 Wilkinson Ave | West side of Wilkinson Ave opposite Civic 763 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Windmill Rd After Akerley Blvd (8533) | 743 Windmill Rd | South side of Windmill Rd adjacent Civic 743 | New concrete shelter pad and shelter. | October 2023 construction |
Windmill Rd After Civic 520 (8535) | 520 Windmill Rd | West side of Windmill Rd across Civic 520 | Slight relocation - new concrete pad and new sidewalk with ped ramp. | Completed October 2023 |
Windmill Rd Before Dawn Dr (8522) | 696 Windmill Rd | West side of Windmill Rd abutting Civic 696 | Shelter replacement. | October 2023 construction |
Windmill Rd Before Wright Ave (8532) | 645 Windmill Rd | West side of Windmill Rd near Civic 645 | Slight relocation - new concrete pad between curb and sidewalk, new concrete shelter pad. Remove old concrete and reinstate sod | Completed August 2023 |
Woodlawn Rd After Mt Edward Rd (8590) | 54 Woodlawn Rd | Northwest side of Woodlawn Rd abutting Civic 54 | Slight relocation - new concrete pad between curb and sidewalk. Remove old concrete and reinstate sod. | Pending 2024 construction |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Hollis St After Barrington St (6938) | 1145 Barrington St | South side of Hollis St abutting 1145 Barrington St | New concrete pad between curb and sidewalk. | Completed August 2023 |
Lemarchant St Before University Ave (7144) | 6136 University Ave | East side of LeMarchant St adjacent 6136 University Ave | Shelter replacement. | Completed November 2023 |
Lower Water St Before Sackville St (8821) | 1601 Lower Water St | East Side of Lower Water Street abutting Civic 1601 | New concrete pad between curb and sidewalk, relocate planter to area just past bus stop (north). | Completed June 2023 |
Spring Garden Rd After South Park St (8322) | Public Gardens | North side of Spring Garden Rd adjacent The Public Gardens | Slight relocation - concrete pad extension for shelter. | Completed June 2023 |
Summer St After Veterans Memorial Ln (2304) | 1747 Summer St | East side of Summer St abutting 1747 Summer St | Concrete pad repair and concrete shelter pad. | Completed June 2023 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Duffus St After Novalea Dr (6583) | 5521/5515 Duffus St | North side of Duffus St abutting Civic 5521/5515 | Shelter replacement. | Pending 2023 construction |
Duffus St At Agricola St (6585) | 5691 Agricola St | North west side of Agricola St abutting Civic 5691 | Slight relocation. New concrete pad between curb and sidewalk. | Completed November 2023 |
Gottingen St After Young St (6770) | No abutting address | West side of Gottingen St adject park | Shelter replacement. | Pending 2023 construction |
Kencrest Ave Before Glebe St (7050) | 3749 Kencrest Ave | South side of Kencrest Ave across Civic 3749 | Remove existing shelter pad replace existing concrete pad behind sidewalk. Shelter to be temporarily removed. | Completed September 2023 |
North St Before Windsor St (7357) | 2590 Windsor St | South east side of North St adjacent 2590 Windsor St | Shelter replacement. | Completed November 2023 |
Oxford St Before Berlin St (7405) | 2733 and 2745 Oxford St | East side of Oxford St in between Civics 2733 and 2745 | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Robie St Before Cabot St (8203) | 3468 Robie St | South west side of Robie St abutting Civic 3468 | Shelter replacement. | Pending 2023 construction |
Windsor St After Connaught Ave (8551) | 3628 Windsor St | South side of Windsor St abutting Civc 3628 | Concrete pad extension. | Pending 2024 construction |
Windsor St Before Maxwell Ave (8565) | 3380 Windsor St | South side of Windsor St abutting Civc 3380 | Slight relocation. New concrete pad between curb and sidewalk. | Pending 2024 construction |
Windsor St Opposite London St (8572) | 2901 Windsor St | North west side of Windsor St abutting Civic 2901 | Shelter replacement. | Pending 2023 construction |
Young St After Monaghan Dr (8629) | 6141 Young St | North west side of Young St abutting Civic 6141 | Shelter replacement. | Pending 2023 construction |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Herring Cove Rd Before Melwood Ave (6900) | No abutting address | South east side of Herring Cove Rd south of Melwood Ave | Shelter replacement. | Pending 2023 construction |
Joseph Howe Dr Before Dutch Village Rd (6984) | 3627 Joseph Howe Dr | East side of Joseph Howe Dr abutting Civic 3627 | Shelter replacement. | Completed November 2023 |
Kelly St After Halef Ct (2300) | 2 Halef Ct | East side of Kelly St adjacent 2 Halef Ct | Consolidation of Alton Dr After Kelly St (8815) and Kelly St Before Halef Ct (9074). New concrete pad between curb and sidewalk. | Completed June 2023 |
Mumford Rd Opposite Hemlock St (7279) | No abutting address | South side of Mumford Rd abutting cemetary | Shelter replacement. | October 2023 construction |
Osborne St Before Sunset Ave (7396) | 28 Sunset Ave | South east side of Osborne St adjacent 28 Sunset Ave | Shelter replacement. | Completed November 2023 |
Oxford St After Quinpool Rd (7412) | 6408 Quinpool Rd | West side of Oxford St adjacent 6408 Quinpool Rd | Shelter replacement. | Completed November 2023 |
Oxford St Before Jubilee Rd (2308) | 1750/1752 Oxford St | West side of Oxford St abutting Civics 1750 and 1752 | Consolidation of Oxford St After Jubilee Rd (7409) and Oxford St Before Norwood St (7419). New concrete pad between curb and sidewalk. | Completed June 2023 |
Purcells Cove Rd After Dingle Rd (8118) | 1452 Purcells Cove Rd | West side of Purcells Cove Rd abutting Civic 1452 | Shelter replacement. | Pending 2023 construction |
Purcells Cove Rd After Sailboat Ln (8122) | No abutting address | North side of Purcells Cove Rd near Reserve Rd | Shelter replacement. | Pending 2023 construction |
Purcells Cove Rd Before Westgate Dr (8116) | 34 Wesgate Dr | North east side of Purcells Cove Rd adjacent 34 Westgate Dr | Shelter replacement. | Pending 2023 construction |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Bedford Hwy After Flamingo Dr (6251) | 188/190 Bedford Hwy | Southwest side of Bedford Hwy abutting Civics 188 and 190 | Shelter replacement. | October 2023 construction |
Bedford Hwy After Torrington Dr (6279) | 2 Torrington Dr | South side of Bedford Hwy adjacent 2 Torrington Dr | Shelter replacement. | Pending 2023 construction |
Flamingo Dr After Dipper Cres (2302) | 114 and 116 Flamingo Dr | Southwest side of Flamingo Dr abutting Civic 114/116 | New concrete pad between curb and sidewalk. | Completed August 2023 |
Flamingo Dr After Dove St (2303) | 61 Flamingo Dr | West side of Flamingo Dr abutting Civic 61 | Relocation of Flamingo Dr Before Dove St (6701). New bus pad, new sidewalk. | Completed August 2023 |
Flamingo Dr After Meadowlark Cr (6706) | DJ Butler Park | North side of Flamingo Dr abutting DJ Butler Park | New concrete pad and sidewalk. | Completed August 2023 |
Flamingo Dr After Nightingale Dr (6698) | 2 Nightingale Dr | East side of Flamingo Dr abutting 2 Nightingale Dr | New concrete pad and sidewalk. | Completed August 2023 |
Flamingo Dr After Nightingale Dr (6699) | 110 Flamingo Dr | Southwest side of Flamingo Dr abutting Civic 110 | Discontinued stop - remove concrete, reinstate sod. | Completed August 2023 |
Flamingo Dr Before Dove St (6701) | 57 Flamingo Dr | West side of Flamingo Dr abutting Civic 57 | Discontinued stop - remove concrete, reinstate sod. | Completed August 2023 |
Flamingo Dr Before Meadowlark Cr (6702) | 96 Flamingo Dr | South side of Flamingo Dr abutting Civic 96 | Slight relocation. New concrete pad between curb and sidewalk. | Completed August 2023 |
Lacewood Dr Before Willett St (6660) | 287 Lacewood Dr | North side of Lacewood Dr abutting Civic 287 | New park bench. | Completed October 2023 |
Main Ave After Hillcrest St (7164) | 176 Main Ave | South side of Main Ave abutting Civic 176 | New concrete pad and sidewalk. | Completed September 2023 |
Main Ave After Maple St (7165) | 80 Main Ave | South side of Main Ave abutting Civic 80 | New park bench. | Completed October 2023 |
Main Ave At Flint St (7167) | 103 Main Ave | North side of Main Ave abutting Civic 103 | New park bench. | Completed October 2023 |
Main Ave Before Borden St (7168) | 17 Skeena St and 18 Borden St | South side of Main Ave between 17 Skeena St and 18 Borden St | Extend concrete pad. | Completed October 2023 |
Main Ave Before Dunbrack St (2009) | 245 Main Ave | North side of Main Ave abutting Civic 245 | New park bench. | Completed October 2023 |
Willett St Before Adelaide Ave (8498) | 104 Adelaide Ave | East side of Willett St adjacent 104 Adelaide Ave | Discontinued stop - remove concrete, reinstate sod. | Completed September 2023 |
Willett St Before Frederick Ave (8500) | 123 Rosedale Ave | East side of Willett St adjacent side yard of 123 Rosedale Ave | Discontinued stop - remove concrete, reinstate sod. | Completed September 2023 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Ketch Harbour Rd After Latter Pond Ln (7056) | 69 Ketch Harbour Rd | West side of Ketch Harbour Rd abutting Civic 69 | Move bus stop forward approximately 10 meters, install post and ashpalt pad. | Completed August 2023 |
Old Sambro Rd At Civic 143 (7392) | 143 Old Sambro Rd | West side of Old Sambro Rd abutting Civic 143 | Relocation of bus stop outside of driveway past the utility pole. New asphalt pad. | Completed August 2023 |
Purcells Cove Rd Before Rocklyn Rd (8115) | 2636 Purcells Cove Rd | West side of Purcells Cove Rd abutting Civic 2636 | Shelter replacement. | Completed November 2023 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Chain Lake Dr At Civic 209 (6394) | 209 Chain Lake Dr | West Side of Chain Lake Dr abutting Civic 209 | Concrete pad extension. | Pending 2024 construction |
Julius Blvd After Susie Lake Cr (2314) | 265 Julius Blvd | Southeast side of Julius Blvd adjacent Civic 265 | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Julius Blvd Before Chain Lake Dr (2316) | 201 Chain Lake Dr | South side of Julius Blvd abutting 201 Chain Lake Dr | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Julius Blvd Before Dugger McNeil Dr (2315) | 125 Julius Blvd | South side of Julius Blvd adjacent Civic 125 | New concrete pad between curb and sidewalk. | Pending 2024 construction |
Julius Blvd Before Dugger McNeil Dr (2317) | 82 Julius Blvd | North side of Julius Blvd adjacent Civic 85 | New concrete pad between curb and multi-use path. | Pending 2024 construction |
Julius Blvd Before Susie Lake Dr (2318) | 265 Julius Blvd | Northeast side of Julius Blvd opposite Civic 265 | New concrete pad between curb and multi-use path. | Pending 2024 construction |
St Margarets Bay Rd After Clearwater Dr (6175) | 1 Devonshire Dr | North Side of St Margarets Bay Rd after Devonshire Dr and St Margarets Bay Rd Intersection | New concrete pad and pedestrian ramp to intersection. | Pending 2024 construction |
St Margarets Bay Rd Before Sheppards Run (6157) | 438 Sheppards Run | South side of St Margarets Bay Rd adjacent 438 Sheppards Run | Shelter replacement. | Pending 2023 construction |
Susie Lake Cr After Hobsons Lake Dr (2311) | 265 Susie Lake Cr | North side of Susie Lake Cr abutting Civic 265 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Susie Lake Cr After Julius Blvd (2319) | 420 Susie Lake Cr | South side of Susie Lake Cr abutting Civic 420 | New concrete pad between curb and multi-use path. | Completed October 2023 |
Susie Lake Cr At Civic 300 (2320) | 300 Susie Lake Cr | South side of Susie Lake Cr adjacent Civic 300 | New concrete pad between curb and multi-use path. | Completed October 2023 |
Susie Lake Cr Before Civic 420 (2312) | 300 Susie Lake Cr | North side of Susie Lake Cr opposite Civic 300 | New concrete pad between curb and sidewalk. | Completed October 2023 |
Susie Lake Cr Before Hobsons Lake Dr (2321) | 265 Susie Lake Cr | South side of Susie Lake Cr opposite Civic 265 | New concrete pad between curb and multi-use path. | Completed October 2023 |
Susie Lake Cr Before Julius Blvd (2313) | 420 Susie Lake Cr | North side of Susie Lake Cr opposite Civic 420 | New concrete pad between curb and sidewalk. New concrete shelter pad and shelter. | Completed October 2023 |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Beaver Bank Rd Before Grove Ave (8751) | 840 Beaver Bank Rd | East side of Beaver Bank Rd abutting Civic 840 | New concrete pad between curb and sidewalk. | Completed November 2023 |
Beaver Bank Rd Before Kinsac Rd (2123) | 1581 Beaver Bank Rd | West side of Beaver Bank Rd before Kinsac Rd | Extend existing asphalt pad forward. | Pending 2024 construction |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Cobequid Rd After Freer Ln (6434) | No abutting address | East side of Cobequid Dr adjacent park | Shelter replacement. | Pending 2023 construction |
Cobequid Rd After Park Ave (6433) | 2 Park Ave | East side of Cobequid Dr adjacent 2 Park Ave | Shelter replacement. | Pending 2023 construction |
Cobequid Rd Before Glendale Dr (6438) | 220 Cobequid Rd | North side of Cobequid Rd abutting Civic 220 | Slight relocation - new concrete pad between curb and sidewalk. | Completed June 2023 |
Downsview Plaza Before Sackville Dr (6579) | 730 Sackville Dr | Southwest side of Sackville Dr near Downsview Plaza | Shelter replacement. | Completed November 2023 |
Glendale Dr Before Cobequid Rd (6750) | 216 Cobequid Rd | West side of Glendale Dr abutting Civic 216 | New sidewalk connection to intersection. | Completed August 2023 |
Old Sackville Rd After Madeline Ave (2041) | 455 Old Sackville Rd | North side of Old Sackville Rd abutting Civic 455 | Repair gravel washout under existing concrete pad. | Completed June 2023 |
Old Sackville Rd Before Walker Ave (2043) | 599 Old Sackville Rd | Northeast side of Old Sackville Rd abutting Civic 589 | Requires asphalt to prevent wash out. | Completed June 2023 |
Sackville Dr At Civic 614 (7309) | 614 Sackville Dr | Southwest Side of Sackville Dr abutting Civic 614 | Discontinued stop - remove concrete, reinstate sod. | Completed June 2023 |
Sackville Dr At Civic 622 (2275) | 622 Sackville Dr | Southwest Side of Sackville Dr abutting Civic 622 | New concrete pad between curb and sidewalk. | Completed June 2023 |
Sackville Dr Before Armoyan Dr (7313) | 300 Sackville Dr | South side of Sackville Dr abutting 300 Sackville Dr | Shelter replacement. | Pending 2023 construction |
Sackville Drive Before Leaside Drive (7325) | 533 Sackville Dr | Northeast side of Sackville Dr abutting Civic 533 | New concrete pad between curb and sidewalk. | Completed June 2023 |
Sackville Terminal Bay 2 (8967) | Sackville Terminal | Sackville Terminal | Shelter replacement. | Completed November 2023 |
Sackville Terminal Bay 3 (8959) | Sackville Terminal | Sackville Terminal | Shelter replacement. | Completed November 2023 |
Sackville Terminal Bay 4 (8960) | Sackville Terminal | Sackville Terminal | Shelter replacement. | Pending 2023 construction |
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
---|---|---|---|---|
Bus Stop Location | Nearest Civic Address | Location of Work | Scope of Work | Status |
Bedford Hwy Before Spring St (6249) | 1326 Bedford Hwy | Northwest side of Bedford Hwy abutting Civic 1326 | Shelter replacement. | November 2023 construction |
Bedford Hwy Before Union St (6228) | 1488 Bedford Hwy | North side of Bedford Hwy abutting Civic 1488 | Shelter replacement. | October 2023 construction |
Bedford Hwy Opposite Fourth St (6283) | 1225 Bedford Hwy | East side of Bedford Hwy abutting Civic 1225 | New concrete pad between curb and sidewalk. | Competed June 2023 |
Broad St Before Larry Uteck Blvd (2027) | 51 Jam Ln | North side of Broad St adjacent 51 Jam Ln | New concrete shelter pad and shelter. | November 2023 construction |
Larry Uteck Blvd After Bluewater Rd (7026) | 380 Bluewater Rd | South side of Larry Uteck Blvd abutting 380 Bluewater Rd | New concrete pad between curb and sidewalk. | Completed September 2023 |
Larry Uteck Blvd After Brookline Dr (2310) | No abutting address | Southwest side of Larry Uteck Blvd near roundabout | New concrete pad between curb and sidewalk. | Completed September 2023 |
Larry Uteck Blvd After Kearney Lake Rd (6298) | 1000 Larry Uteck Blvd | South side of Larry Uteck Blvd abutting 1000 Larry Uteck Blvd | New concrete pad, sidewalk connection, and RA-5 crosswalk. New concrete shelter pad and shelter. | September 2023 construction |
Larry Uteck Blvd Before Abbington Ave (7022) | 29 Abbington Ave | Northeast side of Larry Uteck Blvd adjacent 29 Abbington Ave | New concrete pad, sidewalk connection, and RA-5 crosswalk. | Pending 2024 construction |
Larry Uteck Blvd Before Belle St (7027) | 3 Belle St | Southwest side of Larry Uteck Blvd adjacent 3 Belle St | New concrete pad, sidewalk connection, and RA-5 crosswalk. | Pending 2024 construction |
Larry Uteck Blvd Before Bluewater Rd (7014) | 380 Bluewater Rd | North side of Larry Uteck Blvd across from 380 Bluewater Rd | New concrete pad between curb and new multi-use path. | Completed September 2023 |
Larry Uteck Blvd Before Broad St (2309) | No abutting address | Northeast side of Larry Uteck Blvd near roundabout | New concrete pad between curb and new multi-use path. | Completed September 2023 |