The Zero Emission Bus Project is the first of its kind in Atlantic Canada. The project will result in the addition of more than 200 zero emission buses to the Halifax Transit fleet, an expansion of the Ragged Lake Transit Centre (RLTC), and an eco-rebuild of the Burnside Transit Centre to achieve a net-zero ready standard.
The project aligns with municipal, provincial, and federal climate targets and will help to achieve the goals and actions outlined in HalifACT, the municipality’s climate action plan.
Where we are.
On May 20, 2025, Halifax Transit celebrated the launch of electric buses into service and completion of the Ragged Lake Transit Centre expansion. This marked the final steps in Phase 1 of the Zero Emission Bus Project.

Ragged Lake Transit Centre Expansion & Retrofit
We’ve expanded the Ragged Lake Transit Centre (RLTC) storage facility to accommodate 60 new battery electric buses and associated charging equipment. The project includes:
- Construction of a 3,100 m one-story expansion to the west side of the RLTC bus storage garage.
- The addition of four lanes to the existing bus storage building, will provide space to accommodate 40 additional buses.
- The installation of 67 electric bus charging stalls (up to 5,250 kW), as well as in three existing bus storage lanes.
- Construction to accommodate the increased footprint of the expanded building.
- The Environment & Climate Change division also led a project involving the installation of an extensive solar array on top of the existing building, which was coordinated with the expansion work.

How we got here.
On July 15, 2021, the governments of Canada, Nova Scotia and the Halifax Regional Municipality announced a combined $112 million investment toward the project.
This funding was used to implement Phase 1 of the project, which included:
- the procurement of 60 electric buses
- an expansion of the Ragged Lake Transit Centre to house the buses and associated charging equipment
- a deep energy retrofit of the facility to achieve a net-zero ready standard

Halifax Transit's first pilot electric bus, which arrived in Dec. 2023
The first electric bus arrived in Dec. 2023 and has been used for training, road testing, and public engagement activities. The remaining 59 buses have continued to arrive over the past year.
Beginning Dec. 9, 2024, three electric buses entered into passenger service to test performance in real world conditions, one of the final steps ahead of an official launch.
Halifax Transit
Zero Emission Bus Project: Virtual Tour
What's next.
Phase 2 of the project will include an eco-rebuild of the Burnside Transit Centre to house additional electric buses and achieve net-zero standard. A combined $20.7 million is also being invested in Phase 2 for planning and design:
- Government of Canada: $6.5 million
- Government of Nova Scotia: $7.1 million
- Halifax Regional Municipality: $7.1 million
The new Burnside Transit Centre will be designed and rebuilt to adapt to emerging fuel alternatives. This will allow it to operate the existing diesel fuel and new electric buses, while also planning for other potential fueling alternatives, such as renewable natural gas (RNG) and hydrogen.
Frequently Asked Questions
- What is the Zero Emission Bus Project?
The Zero Emission Bus Project is the first of its kind in Atlantic Canada. The project will result in the addition of more than 200 electric buses to the Halifax Transit fleet, an expansion of the Ragged Lake Transit Centre, and an eco-rebuild of the Burnside Transit Centre to achieve a net-zero ready standard.
The Zero Emission Bus Project aligns with municipal, provincial and federal climate targets and will help to achieve the goals and actions outlined in HalifACT, the municipality’s climate action plan.
- Why is Halifax Transit converting its fleet to more sustainable vehicles?
The Zero Emission Bus Project aligns with climate targets for federal and provincial governments and will also help achieve the goals and actions outlined in the municipality’s climate action plan, HalifACT.
Investing in zero emission public transportation reduces the number of vehicles on our roadways and will result in a decrease of greenhouse gas (GHG) emissions. With an electric drive motor, the Nova Bus LFSe+ electric bus improves air quality by eliminating the emission of pollutants and greenhouse gases.
Along with reducing greenhouse gas emissions, the project will reduce operating costs for Halifax Transit by switching to a low-carbon or zero-emission fleet. The addition of renewable solar energy and plans for future storage capacity will also help make the transit system more resilient.
- How are other orders of government supporting the Zero Emission Bus Project?
On July 15, 2021, the governments of Canada, Nova Scotia and the Halifax Regional Municipality announced a combined $112 million investment toward the project.
This funding is being used to implement Phase 1 of the project, which includes:
- the procurement of 60 electric buses
- an expansion of the Ragged Lake Transit Centre to house the vehicles and the associated charging equipment and,
- a deep energy retrofit of the facility to achieve a net-zero ready standard.
- What is involved with the expansion and retrofit of the Ragged Lake Transit Centre?
The expansion of the retrofit of the Ragged Lake Transit Centre will accommodate storage of up to 60 40-foot electric buses. It includes:
- constructing a 3,100 m2 one-story expansion to the west side of the Ragged Lake Transit Centre bus storage garage.
- adding four lanes to the existing bus storage building, providing space to accommodate up to 40 additional buses.
- installing 67 electric bus charging stalls (up to 5,250 kW) in the new expansion, as well in the three existing bus storage lanes.
- site works to accommodate the increased footprint of the expanded building.
- Halifax’s Environment & Climate Change division is also leading a project to install solar panels on top of the existing building which is being coordinated with the expansion work.
Additionally, to align with the HalifACT target of net-zero municipal operations by 2050, the expansion of the Ragged Lake Transit Centre is designed to a net-zero ready standard. This work includes:
- building design with attention to solar shading and daylighting
- well insulated, with minimum true R-30 walls and true R-40 roof
- improved air ventilation rates (0.6 air changes per hour)
- air curtain for bay doors
- smart building controls, LED lighting and Dedicated Outdoor Air System (DOAS)
- highly efficient heating and cooling system
- maximized on-site solar electricity generation
Construction began on the expansion in June 2023 and was completed in March 2025.
- What is involved in the Burnside Transit Centre Eco-Rebuild?
Phase 2 of the Zero Emission Bus Project will include an eco-rebuild of the Burnside Transit Centre to house additional zero emission buses and achieve a net-zero standard. Funding is now in place for the planning and design phase of the project. The new transit centre is expected to be completed by 2028.
The new Burnside Transit Centre will be designed and rebuilt to adapt to emerging fuel alternatives. This will allow it to operate the existing diesel fuel and new electric buses, while also planning for other potential fueling alternatives, such as renewable natural gas (RNG) and hydrogen.
- Are there new safety requirements associated with electric buses?
All Operators will receive training to safely operate the new electric buses. Training is also being provided to maintenance staff to ensure they can safely service the new electric fleet. Halifax Transit’s new electric buses, chargers, and expanded Ragged Lake Transit Centre will meet all relevant safety regulations, with special care being taken to mitigate potential risks of fire.
- What differences will passengers notice between diesel and electric buses?
The Nova Bus LFSe+ buses are similar to many of Halifax Transit’s existing buses but have an electric motor instead of a diesel motor. The interior layout of the electric buses is also very similar. Each bus will accommodate up to 36 seated passengers – the same seated passenger capacity as diesel 40-foot Nova buses – and will also feature a Q-Pod wheelchair restraint system. Also, the new Nova Bus LFSe+ buses will have a designated seat for people with service animals.
The main difference passengers may notice is that the electric bus is quieter, both on approach at the bus stop and in the interior. Passengers may also notice that stops and starts are smoother.
- Will passengers with vision loss still be able to hear the bus approaching the stop?
Passengers with vision loss may notice that the electric buses are much quieter, both on approach at the bus stop, and in the interior of the bus. Consequently, Halifax Transit’s electric buses will be outfitted with Acoustic Vehicle Alerting Systems, which generate unobtrusive warning sounds when the bus is travelling at low speeds.
- Will the new electric buses travel the same distance as current diesel buses?
The distance that a Halifax Transit bus travels during a typical day can vary greatly depending on the routes it is servicing. The new electric buses have been tested to ensure they will have adequate range to fill many of the roles in our network without making any schedule changes or other operational accommodations.
Some trips require exceptionally long range and will not be serviced by electric buses during the current stage of the Zero Emission Bus Project.
- How will the electric buses perform in extremely cold (-20°C) temperatures or snow?
Halifax Transit staff completed a testing plan with a Nova LFSe+ bus in February and March 2023, during which temperatures reached -20C and a major snow event occurred. The results of this testing indicated no concerns to battery performance or range at low temperatures, or the ability to drive during snowy conditions.
- Where and how will the electric buses be charged?
During Phase 1 of the project, Halifax Transit’s electric buses will be charged exclusively at the Ragged Lake Transit Centre (RLTC). In the future, buses will also be charged at the Burnside Transit Centre following the completion of the facility rebuild.
The expanded RLTC facility will have 35 chargers and 67 charging stalls. Each charger provides power to one or more charging stalls, up to a maximum of three per charger. When multiple buses are connected to a single charger, those buses are charged sequentially, one after another. Charging will mainly take place overnight while the buses are being cleaned and serviced.
- Will chargers for buses be installed on street or at terminals?
During Phase 1 of the project, buses will only be charged at the Ragged Lake Transit Centre.
- Can electric buses be charged as they drive?
Yes. The Nova Bus LFSe+ has a regenerative braking system. This means the system captures kinetic energy during deceleration, storing it in the battery, so that it can be reused as electricity to power the motor. For a city bus that makes a lot of stops, you can imagine how often the battery will charge – every time the brake pedal is pushed!
- How often do the batteries in the electric buses need to be replaced?
Halifax Transit anticipates replacing the batteries as part of the mid-life refit of an electric bus. This second battery will power the bus until it is retired.
- What is the long-term goal of the Zero Emission Bus Project?
The longer-term goal is to transition Halifax Transit to a fully zero-emission fleet. Halifax Transit is currently investigating the future of Halifax Transit’s conventional bus fleet, balancing between battery electric and alternative propulsion technologies, such renewable natural gas (RNG), hydrogen fuel cells, etc.
This project is funded in part by the Government of Canada.
Ce projet est financé en partie par le gouvernement du Canada.